The Floors

I’ve been waiting for this day for a long time.  It’s really nerve-racking when your not that great at decorating and you’re forced to choose all the materials for your kitchen months in advance of the renovation.  Luckily, our designer has a pretty good eye and could tell what I wanted after we spoke with her for an hour or two.

We knew we wanted brown cabinets…apparently a huge deviation from the white ones that are so popular these days.  Call me old school, but I hate white cabinets.  So hard to keep clean and just not warm enough for me.  Jeff and I wanted a warm, inviting environment and, to me, that meant Italian-inspired.

After we picked out the brown cabinets, we chose the countertops and floors.  Speaking of countertops, we should be having them installed this week!  Here’s a sneak peak of what that material looks like:

IMG_9042The first tile Carrie, our designer, picked for us was OK, but the matching subway tile was too big for what we were looking for.  We poked around the showroom looking for exactly what we wanted and, finally, we found it!  It was gorgeous.  Cream colored, with brown veining throughout, it was perfect.  It had that old world charm and just modern enough to fit what we were looking for.

IMG_9381Tom, our contractor, called me on Thursday morning to talk about a couple things and then let me in on the news:  our floors were being installed that day!  He told me there would be areas we wouldn’t be able to walk on, but which would be clearly marked.  Unfortunately, it was my late day at work, so knew it would be a long time before I saw the results.

That evening, Jeff called me, frustrated.  Apparently, they had laid the tile in rows instead of staggered like you normally see tile.TilePattern2

Our tile is like the top left diagram.  We were expecting 50% offset like the top right.  I was talking with a coworker who informed me that that was an option but we had to specify it was what we wanted.  Jeff and I were a little annoyed because we were never asked what our preference was.  I told Jeff to pull the contract to see if it specified in there, which he did.  Wouldn’t you know it…it says straight in the contract.  Actually it says “pattern: none”.  Regardless, neither of us remember them asking us what we’d like.  Fortunately, we still like it enough.  Honestly, it doesn’t really matter if we do or don’t…we’re stuck with it!

They did 80% of the floor Thursday and came back to finish the rest on Friday.  They also installed our washer and dryer Friday.  Thank goodness because the laundry was starting to pile up!!  Three guesses what I did all weekend…

IMG_9403They added door pulls to the cabinets too.  I love them!  They look silverish in this picture, but they are more bronze-y in real life.

IMG_9404Oh, and they plumbed for our kitchen sink.  I’m so ready to not have to do dishes in Jake’s bathroom!

IMG_9405Finally, on Friday, they installed our new sliding patio door.  It arrived with a chip in the handle but Jeff called and took care of that in minutes.  Our new handle is on the way!  I really like our new door.  It has internal blinds, which means we won’t have to have curtains in our kitchen!

Two weeks down and two to go, supposedly.  Fingers crossed they finish on time!  It’s really not a super big deal if they don’t…I’m just anxious to start cooking in my new kitchen!

 

Kitchen Update | Construction

I have struggled with what I want to share about our kitchen project after the demo happened last week.  I want to share, but I also want to have a big reveal at the end of all this.  There have been a ton of changes this week and every day I still rush home to see what new bits and pieces have been accomplished.

Here’s a run down of what’s happened so far:

cabinetsMonday
Probably the most exciting day so far, I walked in to the house to see my cabinets installed!  I actually squealed when I saw them!  Not only were the wall cabinets installed, but the cabinets for the island were in place too.  They weren’t anchored, but they were in roughly the right spot for me to stand behind and picture myself cooking.  Teaser picture of the cabinets above.  Please ignore the tools left behind by the contractor.

I have always had this desire to be cooking in the kitchen and have friends and family sit around my counter watching me cook and talk to me.  I grew up with this type of kitchen atmosphere, watching my mom and dad cook since before I can remember.  It’s where my love of cooking came from.  I remember standing on a chair next to my mom helping her put the pepperoni on the annual Christmas Eve pizza.  I remember forming my favorite sausage balls with her because it wasn’t Christmas day without them.  I remember making chocolate pudding for my older sister’s friends when they stayed over on the weekends.  I remember whipping up chicken sandwiches for my friends after a school dance when everyone came to my house after.  Cooking for friends and family is a feeling I have a hard time explaining.  It is one of the most special things in the world to me and I love it.

Now that I’ve gotten all mushy…

Screen Shot 2017-03-09 at 9.40.34 AMTuesday
The biggest change we noticed on Tuesday was the paint color.  They painted the kitchen and hallway in our color of choice:  Sherwin Williams Familiar Beige (pictured above from their website).  I wanted a color that was easily accented by a wide array of colors so we could change the feel of our room with various textiles.  I was a little worried about the wall color when I first saw it because I thought Jeff might think it was too pink.  There’s a touch of red in the color, but luckily Jeff really liked it.

We also got a door ordered from Home Depot to be installed by our contractor.  Plus they installed the microwave over the spot for the oven.  Finally, the rest of the cement board was installed in the laundry room.  It was another one of those “little things” days where it’s harder to tell what they accomplished.  I know there is a ton of stuff they have to do that I don’t see.  I just patiently wait until those “wow” days!

tileWednesday
Another one of the “little things” days, but with a bigger impact than normal.  Every day when I walk in, the first thing I do is turn on all the lights so I can see as much as possible. Today, I was pleasantly surprised to find they installed the can lights!  We had regular lights beforehand that were covered, making the light diffused and soft.  Not that that’s a bad thing, but in a kitchen you need to see what you’re doing.  You don’t want to accidentally cut off a finger because you thought it was a carrot or something!

They also attached the island counter to the floor.  Finally, I’m pretty sure they are going to start on the tile soon because one of the tiles was placed up against the cabinet.  I was able to see what the two looked like together and I have to say I’m excited.  Our tile is a grayish white with cream and beige veining throughout.  I added a picture of it above and whited out the cement board on the sides so you could get a clear picture, even though it looks a little funny!

We used to have a fan over our kitchen table but decided we’d rather have a chandelier instead.  But John, our designer, suggested we keep the fan in the kitchen, but move it over the oven area.  We have faulted ceilings, so it would be very high, but that would give us even more air movement.  What a nice option in the summer!

I noticed when they installed the lights Wednesday, they marked the location for the chandelier but, when I stood under the mark, I realized it wasn’t centered over where the table was going to be.  So I left Tom a message about it and he called me Thursday morning to discuss it.  During that conversation, he mentioned before the weekend they were going to start the tile, install the granite in the laundry room, replace the door, add hardware to the cabinets, and begin plumbing the kitchen sink!  Yay!  It’s only been a week and a half and I’m already in love with my new kitchen.  I can’t wait to share the finished product with you!

But for now you must wait…muah ha ha ha.